Solar EPC · Own the Asset

Own your solar plant.
Own your energy costs.

Turnkey solar EPC — capex model. Design, supply, installation, and commissioning for commercial and industrial facilities. Minimum 200 kW. PAN India.

100%
Yours from Day 1
18–24%
Typical IRR (Illustrative)
3–5 yrs
Typical payback (Illustrative)
200 kW
Minimum project size
Scroll to explore
EPC vs RESCO

Which model is
right for you?

Both routes deliver solar at your facility. The difference is who owns the asset — and how you pay for it.

EPC — Capex model
You pay upfront
  • You invest the capital upfront
  • You own the plant from Day 1
  • No ongoing payments to us after commissioning
  • Full savings accrue to you immediately
  • Typical payback: 3–5 years (Illustrative)
  • Typical IRR: 18–24% (Illustrative)
RESCO — Zero capex
Zero capex
  • We invest — you pay per unit consumed
  • We own the plant through the PPA period
  • 20–30% saving from Day 1, no capital outlay
  • Plant transfers to you at PPA end
Learn more about RESCO →

* IRR and payback figures are illustrative. Actual values depend on your state, DISCOM tariff, and consumption profile.

What We Deliver

Every phase.
Our responsibility.

From the first shadow analysis to live SCADA monitoring — we own every stage of your project.

01

Engineering & Design

Shadow analysis, structural load study, single-line diagram, and detailed project report. ALMM-listed Tier 1 TOPCon modules. Hot-dip galvanised or aluminium mounting structure specified to your site.

02

Supply & Procurement

We manage the full equipment supply chain — panels, string or central inverters, BOS, mounting, and cabling. No subcontracting of core supply. Equipment ordered directly from manufacturers.

03

Installation & Commissioning

Civil, mechanical, and electrical execution by our team. DISCOM synchronisation, net metering application, and grid connectivity managed end to end — including the DISCOM interface.

04

Monitoring & EPOP Integration

Plant-level SCADA with remote monitoring from Day 1. Generation data feeds directly into the EPOP platform — giving you ongoing procurement optimisation, not just a one-time installation.

Our Portfolio

Projects we're
proud of.

From textile factories to schools — solar installations commissioned across Haryana, Rajasthan, and beyond.

Project Timeline

12–20 weeks from contract
to commissioning.

Timeline varies by state DISCOM and plant size. We manage every step — including the DISCOM interface.

Weeks 1–3
Site Assessment & DPR

Shadow analysis, load study, structural survey, and detailed project report. Free of charge, no obligation.

Weeks 4–5
Commercial Close

Contract signing, advance payment, equipment order placed with manufacturers.

Weeks 5–10
Equipment Procurement

Tier 1 ALMM-listed TOPCon panels, inverters, mounting structure, and BOS components. Lead times managed by us.

Weeks 10–14
Civil & Mechanical

Foundation works, mounting structure installation, cable tray routing.

Weeks 14–16
Electrical & Commissioning

AC/DC wiring, inverter commissioning, plant SCADA setup, performance baseline established.

✓ Weeks 16–20
DISCOM & Net Metering

DISCOM inspection, net metering application, grid synchronisation. We manage the complete interface.

Suitability

Is EPC
right for you?

Six criteria. Tick all six and the economics work. A free site assessment confirms the numbers.

You want to own the solar asset from Day 1

EPC means full ownership from commissioning. The asset sits on your balance sheet, depreciates under Section 32, and generates returns over its 25-year life.

Capital available for a one-time investment

The full project cost is paid by you — typically in milestone tranches. Capex financing through term loans is also available and we can assist with the lender interface.

Peak contracted load ≥ 200 kW

Our minimum EPC project size is 200 kW. This suits facilities with a contracted peak demand of 200 kW or above.

Rooftop or ground space available at your facility

We need clear, unshaded area — rooftop, carport, or open ground. We assess and confirm during the free site visit.

Currently paying ₹6/unit or more to your DISCOM

The economics of solar EPC improve at higher grid tariffs. At ₹6/unit or above, a well-designed plant typically delivers an IRR of 18–24% (illustrative).

Facility operational for 5+ years with stable consumption

A stable, predictable load profile means the plant is sized correctly and payback projections hold. Seasonal or volatile loads are assessed case by case.

Not sure if EPC fits? Explore our RESCO model — zero capex, 20–30% savings from Day 1.

FAQ

Frequently asked
questions.

Common questions about the EPC model, costs, timelines, and ownership.

What does EPC mean in solar?
EPC stands for Engineering, Procurement, and Construction. It means we handle everything — from the initial site survey and system design, through equipment sourcing, to installation and DISCOM commissioning. You get a turnkey solar plant, fully operational.
How much does a solar EPC project cost?
Cost depends on system size, site conditions, and equipment specifications. For commercial rooftop systems above 200 kW, costs typically range from ₹35,000 to ₹45,000 per kWp (indicative). A detailed quote follows the free site assessment.
What is the difference between EPC and RESCO?
In EPC, you invest the capital and own the plant from Day 1 — higher upfront cost, but maximum long-term savings. In RESCO, we invest and you pay per unit at a rate below your DISCOM tariff — zero capex, but lower overall savings over 25 years.
Do you handle net metering and DISCOM approvals?
Yes. We manage the complete DISCOM interface — application filing, inspections, meter installation, and grid synchronisation. This is included in the EPC scope.
What warranty and maintenance is included?
Panels carry a 25-year linear performance warranty from the manufacturer. Inverters typically have 5–10 year warranties. We offer optional Annual Maintenance Contracts (AMC) for ongoing cleaning, monitoring, and preventive maintenance.
Get Started

Request a free
site assessment.

Share your details and we'll schedule a no-obligation site visit within 7 working days. The assessment, DPR, and financial projections are free.

No spam. We'll reach out within 2 business days.

Request Received

Our team will contact you within 2 business days to schedule your free site assessment.