Solar energy at your site.
Zero investment from you.
We design, finance, build, and own the solar plant at your facility. You pay a fixed rate per unit of electricity — always lower than your grid tariff. The asset transfers to you at PPA end, at no cost.
The RESCO model
in three steps.
No upfront cost. No maintenance. No complexity. We own the plant — you own the saving. And at PPA end, you own everything.
We install
We design, finance, and build the solar plant at your facility. Every component — panels, inverters, mounting structure, wiring, and grid connectivity — is funded and managed entirely by us.
You buy the electricity
You pay only for the electricity the plant generates, billed at a fixed rate lower than your current DISCOM tariff. No capital expenditure. No maintenance responsibilities. Just a lower electricity cost.
You own the asset
At the end of the PPA, the solar plant transfers to you at no additional cost — a fully paid-off asset generating electricity at near-zero marginal cost for the remaining life of the plant.
What you
commit to.
We do not publish project-specific tariff rates. Your rate is established during the free site assessment, based on your location, irradiance, and load profile.
Projects we're
proud of.
From textile factories to schools — solar installations commissioned across Haryana, Rajasthan, and beyond.
From yes to solar bill —
in under six months.
We manage the entire process. Your only decision is whether to proceed.
We assess your roof or ground space, review your DISCOM bills, and prepare your detailed savings projection — at no charge and with no obligation.
We present the PPA terms and savings forecast. You review at your own pace — no pressure, no commitment until you're satisfied.
We establish the project entity and secure all project financing. Nothing required from you at this stage — we handle the entire capital structure.
Design, supply, installation, testing, and commissioning — fully managed by our engineering team. All regulatory approvals included.
The plant goes live. Your electricity bill drops from Day 1 — at the agreed rate, always lower than your DISCOM tariff. Savings begin immediately.
Is RESCO
right for you?
Four criteria. Tick all four and we can start immediately. A free site assessment confirms everything before you commit to anything.
Peak electricity load ≥ 200 kW
RESCO is sized to your contracted demand. Facilities with a peak load of 200 kW or above are eligible. Smaller loads are served through other procurement channels.
Rooftop or ground space available
We need clear, unshaded area — rooftop, carport, or open ground — to install the panels. We assess and confirm viability during the free site visit.
Stable location for 7–10 years
A RESCO PPA is a 7–10 year agreement. The facility must be expected to remain operational at that location for the full PPA tenure.
Currently paying ₹6/unit or more
RESCO economics improve at higher grid tariffs. If you're paying ₹6/unit or above to your DISCOM, solar typically delivers meaningful, immediate savings from Day 1.